Nuon Heat Storage

Nuon Heat Storage

Project: Nuon Heat Storage - Diemen

Contractor: Cofely West Netherlands

Advanced Valve Solutions Delivery:

  • ZWICK, Metal Seated, Stop Check valves.
  • HORA, DN350 PN16, Discharge valves.

Nuon Limited,  is currently developing an extension of its existing facilities, at the Diemen location, in the Netherlands.The current facility in Diemen, consists of two Combined Heat and Power Plants (DM33 & DM34) and five auxiliary gas fired boilers. The proposed extension consists of a heat accumulation tank, connected to the existing district heating supply system. Advanced Valve Solutions is proud to be the awarded, as key supplier for discharge HORA control valves and  Zwick metal seated, triple eccentric stop check valves.