Cygnus Field Development Project

Cygnus Field Development Project

Project: Cygnus Development Project - GDF SUEZ E&P UK ltd

Contractor: Saipem Limited

Advanced Valve Solutions levering:

  • Perrin subsea ROV operated ball valves
  • Deepstar Hotstabs

One of the largest undeveloped gas finds in the Southern North Sea is the Cygnus field, located within UKCS Blocks 44/12a and 44/11a.

The field comprises both Leman and Carboniferous reservoirs with up to five potential productive fault blocks. GDF Suez, which holds a 38.75% interest, operates Cygnus; Centrica holds 48.75%; and Endeavour holds the remaining 12.5%.

Saipem Ltd was responsible for installation of the 50 km long 24” export pipeline, 7.3 km long 12” production pipeline and infield control and SSIV umbilicals.

AVS advised and supplied all compontents (valves and hotstabs) related to the Pig Lauchers and Receivers for this project. 

Contact opnemen met AVS Olie & Gas

Heeft u vragen of wilt u dat wij contact met u opnemen? Vul het onderstaande formulier in, we nemen zo spoedig mogelijk contact op. De velden gemarkeerd met een * zijn vereist.

Bedrijfsnaam*

Wat is de bedrijfsnaam?
Contactpersoon*

Wie is de contactpersoon?
Emailadres*

Wat is je Emailadres?
Telefoonnummer*

Wat is het telefoonnummer?
Bericht

Invalid Input
Ongeldige invoer